All speakers at the September 11, 2018 CSD Board meeting were opposed to approving the massive Marinwood Maintenance Compound before we hold a public workshop. We need to analyze alternative designs with budget and size constraints. The CSD board completely disregarded the public concerns from the 2017 workshop and doubled the size and cost of the current facility. Former Marinwood CSD Director, Bill Hansell was quietly chosen as the principle architect.. The Hansell Design blocks the walking trail and is four times the cubic volume of the current maintenance garage. The drive through design wastes 1/3 of the interior volume and will force parking, material and landscaping debris storage outside the facility.
No comments:
Post a Comment