Sunday, December 22, 2019

A White Elephant Stampede for a Maintenance Compound at the Marinwood CSD

A White Elephant Stampede for a Maintenance Compound at the Marinwood CSD

The Marinwood Maintenance Facility has a few "problems"



I get tired of fighting for the right of an honest government process.   The Marinwood Maintenance Shed project has been everything but honest.  

Fortunately, the CSD antics have caught the eye of the Community Development and they will require public review of the project.  It may be our only chance at being heard. 

We have a lot to say.

1. The project is too big.   Heck you can literally drive a truck through it!  As those of us who have examined the plans in detail realize,  it is grossly over scaled for our 14 acre park.   McInnis Park is 450 acres yet their six person staff is quite content with 1200 square feet of office and garage space.  Our three workers are outside 90% of the time and don't need exclusive indoor workshops with showers etc.

2. The project is too expensive.  In February, Eric Dreikosen announced that he was in talks with a mysterious architect  that would cost $12,000 for the ENTIRE PROJECT.  Two months later Hansell Design billed $11,931.73  by May 2018.  He hasn't billed or submitted time sheets since that date but we expect his total billing to exceed $42,000 BEFORE Plan Approval.   Despite, this the Marinwood CSD board and staff are unconcerned and WILL NOT REVEAL PROJECT COSTS.

3. The project has severe legal implications for Marinwood CSD. Why did Eric Dreikosen forget to mention the architect he hired was Bill Hansell, the former CSD director who hired him in 2016? This is clearly a violation multiple codes of government contracting rules, open meeting laws and conflict of interest.  Severe fines and even felony charges could be levied.

4. The project is too close to Miller Creek and violates the Marin County General Plan of 2007.  The project is a mere 40 feet from the top of stream bank.  Because the architect chose a drive through design, the 4400 square foot compound is much larger than it needs to be.  A conventional side access garage as built in virtually every other landscaping department in Marin requires only a third of the space.   In addition, the Marinwood "White Elephant"  will require additional outside storage of vehicles, materials, equipment and landscaping debris.

5. Marinwood CSD is violating the purpose of Measure A funds to enhance the beauty of the parks, recreation, accessibility and restoring natural areas.  They are using it for a capital project which should have been part of the long term strategic plan.  Improvements for park shade structure, safety handrails, playground equipment are being ignored over protest from the public.

6. Ironically, a sensible maintenance garage alternative was identified by Irv Schwartz, CSD Board Member and well known Engineer/Developer in 2017 in a project known as Option #3 .  It is a long side access garage that is largely outside the stream conservation area and can be built for a fraction of the cost using conventional construction or prefab units.  The public enthusiastically endorses this alternative and it could be approved immediately.
Maintenance Shed Option 3.PNG

Marinwood CSD needs to get this project back on track immediately with a full review of its government contracting process, public disclosure, accounting and environmental process.  If it willfully violates the law, then all parties responsible should be held to account.

Let's replace the maintenance garage instead.

Sign the Petition HERE

Tuesday, November 6, 2018

Do Taxpayers Owe HansellDesign $42,000 for his drawing?

Do Taxpayers Owe HansellDesign $42,000 for a drawing?


Hansell Design was hired secretly by Eric Dreikosen, Marinwood CSD manager on February 14, 2018 after the board approved the "mystery architect" at the February 13, 2018 Marinwood CSD meeting.  Bill Hansell, former CSD Director HIRED Eric Dreikosen in 2016 as the Marinwood CSD Manager despite lacking any government agency or accounting experience.  

============================================================================

Here is a clip from the February 13 2018 meeting where Mr Dreikosen presents his choice of architect at an estimated cost of $12,000.  Notice his lack of details about the identity of the architect, how he was chosen and the total amount to be paid by the CSD.

Here is how Eric Dreikosen responded to a question from the public regarding his representation of the architects costs at the February 13, 2018 Marinwood CSD meeting:   

"It appears that comments made at a board meeting regarding architect costs are being taken out of context and are not representative of what was stated. 
It was not stated that the architect cost estimate for the entire project was $12,000.  What was stated is that for projects such as the maintenance facility, soft costs are approximated at an additional 20% of construction costs typically.  Of that 20%, architect services typically account for 60% of the 20%.  Based on that formula, I used an example of if construction costs are $100,000, soft costs would be an additional $20,000 with architect fees accounting for $12,000 of the $20,000.  $100,000 is the same construction cost figure provided and used by the other architect who submitted a proposal."

Does that sound like an accurate description of the February 2018 Marinwood CSD meeting to you?
==================================================================== 


Immediately after receiving the commission,  Hansell Design billed $11,931.73  by May 2018.  This is $6,000 per month. As of November 2018, we can expect that we owe Hansell Design another $30,000 but we cannot be certain. Since then the board has refused to acknowledge the growing cost of HansellDesign who has worked an additional five months without submitting bills or even timesheets.

HansellDesign is billing at $125/hour plus expenses.  Surely his costs have grown substantially and still the project is in the "drawing phase"  Those of us who are paying close attention are appalled at the lack of rigor, misstatements and questionable bookkeeping.

It is corrupt business practice and collusion.  Multiple government contracting laws are being broken and it could rise to a felony criminal investigation.    Government employees are not allowed to hide costs from the citizens nor can they collude privately with individuals.

As much as it pains me to say so, the project should be halted immediately until a full investigation can happen.

We need a new maintenance facility.  A one similar to size and scale of McInnis Park (1200 sf) will be more than adequate and cause minimal disturbance to Marinwood Park.  It is time to stop wasting money on a White Elephant project that will destroy a large area of our park that is to be used for recreation and nature preservation.





Sign the Petition HERE